MSP N-central

Allow scheduling of Report Manager/N-Central Server Sync

Currently we are stuck with whenever N-Central server decides to sync data between the N-Central Report Manager and the N-Central Server. It would be great to be able to increase the time frame that data is sync'd and/or to be able to the change time(s) that the data syncs.

Tags

Idea No. 3940